STARTING UP
Having followed the installation instructions (ventilation, temperature, room conditions,
water quality, etc…), proceed as follows:
1) Open water faucet. Check for leaks.
2) Plug machine into electricity mains supply.
3) Switch on the machine (the switch is in the front of the machine).
4) Ensure that there are no strange vibrations or scraping sounds.
5) Check that the water curtain moves freely.
6) Verify that the nozzles send water to the evaporator in the correct direction (uniform
fans).
7) After 10 minutes, check that the water bin has no leaks on the maximum level overflow.
ATTENTION:
ADVISE THE FINAL USER ON MAINTENANCE PROCEDURES WHICH ARE NOT
INCLUDED IN WARRANTY, AS WELL AS THOSE BREAKDOWNS CAUSED BY
NEGLECT OF PROPER MAINTENANCE PROCEDURES.