
6
GB
PLEASE PHONE US TO REGISTER YOUR APPLIANCE AND ACTIVATE YOUR PARTS GUARANTEE ON 08448 24 24 24
Conversion for use on Butane or Propane
Each hob burner requires the injector to be replaced and each burner gas
tap to have the by-pass screw adjusted according to the following procedure:
1. Lift off the burner cap and the burner body and place it to one side.
2. Remove the injector from the burner base with a suitable box spanner
and discard.
3. Replace the injector with the appropriate replacement (see Table).
4. Repeat for each burner.
5. Replace the burner bodies and caps, taking care that they are positioned
correctly.
6. Remove the tap knob from the left hand hotplate tap. Insert a narrow at
screwdriver centre of the tap spindle and turn fully clockwise. Replace the
tap knob. Repeat this procedure with the other six hotplate taps.
7. Position and x the self-adhesive LPG conversion label over the gas details
on the rating plate label.
Space for xing
The cooker can be close tted below hotplate level. This requires a minimum
distance of 600mm between cupboard units of hotplate height.
When installing next to a tall cupboard, partition or wall, for a minimum distance
of 400mm above hotplate level, allow a side clearance of at least 65mm.
The diagram below illustrates the minimum clearance between the cooker
and adjacent walls, cupboards etc.
The wall behind the cooker, 50mm below and 450mm above, and the width
of the cooker, must be a non-combustible material such as ceramic wall tiles.
If the cooker is to be tted close to a corner on the left hand side, ensure that
there is a clearance of at least 50mm to allow the main oven door to open
fully for when removing oven shelves.
750
mm min.
400
mm min.
1005
mm min.
65
mm min.
Cooker hoods
If a cooker hood is to be installed, refer to the cooker hood manufacturers’
instructions regarding xing height.
UNPACKING THE COOKER
Unpack the components from inside the grill and oven. Check that the following
parts are present:
Meat pan Pan supports (3)
Grill pan, grid and handle LPG conversion kit
Loose burner parts (14) Oven shelves (4)
Aluminium burner bodies (6) Griddle
Wok Stand Literature pack
After unpacking your cooker, make sure that you remove all the packing from
the oven and grill, and any stickers from the oven door and the hob.
Levelling
Your cooker is heavy, so it would be advisable for two people to move it. The
cooker is tted with rear wheels and will slide into position easily. Movement
of your cooker is most easily achieved as follows. Open the grill/oven door
sufciently to allow a comfortable grip on the underside front edge of the
oven roof, avoiding any grill or oven interior furniture, and then lift and slide
back at the same time.
Your cooker must stand on a at surface so that the hob is perfectly level, and
the cooker is stable and cannot be rocked, this is easily achieved by adjusting
the three feet which are under the front of the cooker and the 3 castors under
the rear of the cooker, if necessary.
NOTE: If the cooker is to be placed on a base, precautions must be taken to
prevent it from slipping off the base.
The cooker is designed to match the depth of standard 600mm worktops. An
adaptor backplate should, therefore, be tted within the shaded area shown
to allow the cooker to be pushed fully to the wall. If a forward facing backplate
is used, it must be chased into the wall.
180
370
450
250
750
750
Connection to the cooker should be made with an approved appliance exible
connection in according to current National legislation. A length of 0.9 to 1.25m
is recommended. The length of hose chosen should be such that when the
cooker is in situ, the hose does not touch the oor.
The temperature rise of areas at the rear of the cooker that are likely to come
in contact with the exible hose do not exceed 70°C.
LPG cookers should be connected with a hose suitable for LPG and capable
of withstanding 50mbar pressure.
WARNING - THIS APPLIANCE MUST BE EARTHED
Your cooker should have been checked to ensure that the voltage corresponds
with your supply voltage, which is stated on the data badge tted on the rear
panel.
The cooker must be connected by a contractor/engineer who is registered with
the National Inspection Council for Electrical Installation Contracting (NICEIC),
to a suitable double - pole control unit with a minimum rating of 30A and a
minimum contact clearance of 3mm, which should be tted adjacent to (but
not above) the cooker, in accordance with IEE regulations.
Comentarios a estos manuales